20
3/8
13
Front Fascia Installation
Attach front fascia to center of support beam. Slide top of fascia up under sup-
port beam as shown, resting bottom on bottom shelf. Fasten with (4) #14 x 1/2”
screws.
4 X
N570-0080 (#14 X 1/2")
14 Tank Inhibitor Rod Installation
Insert one end of tank inhibitor rod into hole in back panel and other end into hole
in back side of fascia as illustrated.
PROPANE ONLY
Comments to this Manuals